CDK
🦆
Ducklings Continuum Proposal
Epoch 51 Continuum Municipal Affairs Short-term (0–2 years)
In Simulation

Calgary Civic Investment: Phase 2

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$10.00B CAD
Direct government spending
Projected Economic Impact
+$5.7B CAD
1 variables affected across the causal graph
Projected Return
1:1
Economic return per dollar spent
Top Cascade Effects (click to expand)
Trade Balance+$5.7B CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Short-term (0–2 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 51
Continuum Entry

Overview

Phase 2 of Calgary's growth investment: more sworn officers -> faster response times; road maintenance -> road condition; library expansion -> literacy; rec facilities -> physical activity; planning -> housing starts. Five municipal services, five community outcomes.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 51). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Municipal Affairs  |  Proposal ID: 124  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Municipal Affairs. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]