Baker Duck
🦆
Ducklings Continuum Proposal
Epoch 71 Continuum Energy Medium-term (2–5 years)
In Simulation

Alberta Grid Decarbonization: Emissions Intensity

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.
$3.00B CAD
Fiscal Impact
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 71
Continuum Entry

Overview

Carbon emissions debates and Alberta-specific energy discussions identified Alberta's grid emissions intensity as a key lever. Alberta grid renewable share is currently 15% — debates on renewable transition call for acceleration. Provincial emissions reduction complements federal climate targets. Chain: alberta_renewable_investment -> alberta_grid_emissions_intensity (-0.15, d8), grid_decarbonization -> provincial_emissions_alberta (-0.10, d12).

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 71). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 155  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]