Baker Duck
🦆
Ducklings Continuum Proposal
Epoch 33 Continuum Energy Medium-term (2–5 years)
In Simulation

Interprovincial Clean Power Grid: $8B

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.
$8.00B CAD
Fiscal Impact
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 33
Continuum Entry

Overview

Major expansion of east-west electricity trade through new transmission interconnections. Quebec, Manitoba, and BC hydro surplus flows to Alberta and Saskatchewan. Chain: interprovincial_electricity_trade -> quebec_hydro_export_revenue (+0.40, d1) + national_grid_emissions_intensity (-0.30, d1) + alberta_grid_emissions_intensity (-0.20, d2) + bc_hydro_export_revenue (+0.20, d1) + manitoba_hydro_export_revenue (+0.15, d1). Clean electrons replace dirty ones.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 33). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 93  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]