National East-West Grid Interconnection
Overview
A $15B federal-provincial investment in east-west transmission lines allows Quebec, Manitoba, and BC hydro surplus to power Alberta and Ontario. Reduces grid emissions, creates hydro export revenue, and improves energy security.
Ducklings Simulation
This proposal is active in the Ducklings causal simulation (Epoch 11). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.
Domain: Energy | Proposal ID: 42 | Series: Continuum
How to Engage
Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.
Contact: [email protected]