Baker Duck
🦆
Ducklings Continuum Proposal
Epoch 16 Continuum Energy Medium-term (2–5 years)
In Simulation

Ontario Clean Grid: Nuclear + Renewables

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.
$5.00B CAD
Fiscal Impact
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 16
Continuum Entry

Overview

Ontario combines refurbished nuclear (Bruce, Darlington) with expanded solar and wind to push renewable capacity to 12 GW. Provincial emissions drop 13% as gas peaker plants are displaced. Supports EV manufacturing with clean electricity supply.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 16). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 54  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]