Ducklings Continuum Proposal
Epoch 16 Continuum Energy Medium-term (2–5 years)
In Simulation

Ontario Clean Grid: Nuclear + Renewables

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$14.00B CAD
Direct government spending
Projected Economic Impact
+$0 CAD
4 variables affected across the causal graph
Projected Return
N/A
Economic return per dollar spent
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 16
Continuum Entry

Overview

Ontario combines refurbished nuclear (Bruce, Darlington) with expanded solar and wind to push renewable capacity to 12 GW. Provincial emissions drop 13% as gas peaker plants are displaced. Supports EV manufacturing with clean electricity supply.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 16). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 54  |  Series: Continuum