In Simulation

Quebec Wind-Hydro Integration: 6 GW

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$2.00B CAD
Direct government spending
Projected Economic Impact
+$39.2B CAD
9 variables affected across the causal graph
Projected Return
20:1
Economic return per dollar spent
Top Cascade Effects (click to expand)
Nunavut Nominal GDP+$12.7B CAD
Yukon Nominal GDP+$9.1B CAD
NWT Total Tax Revenue+$5.6B CAD
NWT Resource Revenue+$4.8B CAD
Nunavut Total Tax Revenue+$3.8B CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 16
Continuum Entry

Overview

Quebec leverages its hydro reservoirs as giant batteries for intermittent wind power. 2 GW of new wind capacity integrated with Hydro-Quebec dispatch creates a 24/7 clean power export product. Export revenue grows as New England and New York buy Canadian clean electrons.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 16). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 55  |  Series: Continuum