CDK
🦆
Ducklings Continuum Proposal
Epoch 45 Continuum Energy Immediate (weeks–months)
In Simulation

TMX Pipeline at Full Capacity: 95%

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$-7.60B CAD
Direct government spending
Projected Economic Impact
-$46.6B CAD
7 variables affected across the causal graph
Projected Return
N/A
Economic return per dollar spent
Top Cascade Effects (click to expand)
Budgetary Balance (Deficit/Surplus)$15.0B CAD
Direct Program Expenses$15.0B CAD
Fiscal Room (Capacity for New Spending)$15.0B CAD
Federal Debt (Accumulated Deficit)$1.6B CAD
Business Investment Growth+$20M CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Immediate (weeks–months)
Time Horizon
Not assessed
Implementation Risk
Epoch 45
Continuum Entry

Overview

Trans Mountain expansion reaches full operational capacity at 95% utilization. Chain: tmx_capacity_utilization -> western_canadian_select_discount (-0.40, d1). Higher pipeline throughput narrows the WCS-WTI price spread that has cost Alberta billions in stranded value.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 45). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 110  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]