Housing Construction Boom: 300K Starts
Overview
Zoning reform, modular construction, and immigrant trades workers push housing starts to 300K annually. Chain: housing_starts -> construction_employment (+0.25, d1) + calgary_assessment_base (+0.40, d1) + housing_affordability (+0.30, d3) + housing_completions (+0.70, d6). The 6-epoch delay on completions shows the construction pipeline lag.
Ducklings Simulation
This proposal is active in the Ducklings causal simulation (Epoch 39). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.
Domain: Housing | Proposal ID: 95 | Series: Continuum
How to Engage
Discuss this flightplan in the Pond forum under Housing. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.
Contact: [email protected]