Infrastructure Decade: $55B Annual
Overview
National infrastructure program: transit, bridges, broadband, water. Contains the most important FEEDBACK LOOP in the system: infrastructure_spending -> gdp_growth (+0.04, delay 8) -> infrastructure_spending demand. Also: construction_employment (+0.5, d1) + employment_rate (+0.02, d2) + productivity_growth (+0.003, d4) + trade_volume (+0.15, d4). The multiplier effect in action.
Ducklings Simulation
This proposal is active in the Ducklings causal simulation (Epoch 33). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.
Domain: Infrastructure | Proposal ID: 89 | Series: Continuum
How to Engage
Discuss this flightplan in the Pond forum under Infrastructure. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.
Contact: [email protected]