CDK
🦆
Ducklings Continuum Proposal
Epoch 45 Continuum Infrastructure Long-term (5+ years)
In Simulation

National Transportation Corridor: $45B

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$0.50B CAD
Direct government spending
Projected Economic Impact
+$79.8B CAD
5 variables affected across the causal graph
Projected Return
160:1
Economic return per dollar spent
Top Cascade Effects (click to expand)
GDP Cost of Trade Barriers (reduced)+$54.0B CAD
Interprovincial Trade Volume+$24.0B CAD
Nominal GDP+$1.8B CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Long-term (5+ years)
Time Horizon
Not assessed
Implementation Risk
Epoch 45
Continuum Entry

Overview

National trade corridor strategy: port expansions, rail upgrades, highway twinning, and northern airports. Chain: transportation_spending -> trade_balance (+0.20, d12). The 12-epoch delay reflects the reality that infrastructure takes years to impact trade flows. Students see the longest infrastructure delay in the model.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 45). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Infrastructure  |  Proposal ID: 115  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Infrastructure. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]