CDK
🦆
Ducklings Continuum Proposal
Epoch 1 Continuum Housing Medium-term (2–5 years)
In Simulation

Housing Starts Acceleration Program

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$2.50B CAD
Direct government spending
Projected Economic Impact
-$7.7B CAD
59 variables affected across the causal graph
Projected Return
N/A
Economic return per dollar spent
Top Cascade Effects (click to expand)
Goods and Services Tax (GST)+$2.1B CAD
Public Debt Charges (Interest)+$1.2B CAD
Business Investment Growth$820M CAD
Corporate Income Tax$615M CAD
Corporate Tax Revenue$615M CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 1
Continuum Entry

Overview

Zoning reform incentives, fast-tracked permits, and modular housing investment push annual starts to 310K. Increases construction employment, housing completions, and municipal tax bases.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 1). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Housing  |  Proposal ID: 28  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Housing. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]