CDK
🦆
Ducklings Continuum Proposal
Epoch 11 Continuum Energy Medium-term (2–5 years)
In Simulation

National East-West Grid Interconnection

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
$2.50B CAD
Direct government spending
Projected Economic Impact
-$3.6B CAD
7 variables affected across the causal graph
Projected Return
N/A
Economic return per dollar spent
Top Cascade Effects (click to expand)
Trade Surplus with US$12.0B CAD
Exports to United States+$5.8B CAD
Alberta Nominal GDP+$5.6B CAD
Nominal GDP$3.8B CAD
Total Tax Revenues+$658M CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 11
Continuum Entry

Overview

A $15B federal-provincial investment in east-west transmission lines allows Quebec, Manitoba, and BC hydro surplus to power Alberta and Ontario. Reduces grid emissions, creates hydro export revenue, and improves energy security.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 11). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Energy  |  Proposal ID: 42  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]