Ontario Clean Grid: Nuclear + Renewables
Overview
Ontario combines refurbished nuclear (Bruce, Darlington) with expanded solar and wind to push renewable capacity to 12 GW. Provincial emissions drop 13% as gas peaker plants are displaced. Supports EV manufacturing with clean electricity supply.
Ducklings Simulation
This proposal is active in the Ducklings causal simulation (Epoch 16). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.
Domain: Energy | Proposal ID: 54 | Series: Continuum
How to Engage
Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.
Contact: [email protected]