Baker Duck
🦆
Ducklings Continuum Proposal
Epoch 21 Continuum Indigenous Affairs Medium-term (2–5 years)
In Simulation

Indigenous Safety: Officers + Infrastructure

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.
$5.00B CAD
Fiscal Impact
Medium-term (2–5 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 21
Continuum Entry

Overview

800 new officers for FNPP and $3B in First Nations infrastructure (water, roads, housing). Longest traceable chain in the system: officers -> response_times (d1) -> community_safety -> wellbeing_index + incarceration_rate. Infrastructure -> drinking_water_advisories (d4). Reconciliation made measurable.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 21). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Indigenous Affairs  |  Proposal ID: 66  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Indigenous Affairs. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]