BoC Easing Cycle: 2.25%
Overview
Bank of Canada cuts 75bp as inflation normalizes, easing monetary conditions. Chain: boc_overnight_rate -> prime_rate (+1.0, immediate) + corra_rate (+0.95, immediate) + boc_fed_spread (immediate) + goc_10y_rate (+0.35, d1) + mortgage_rate_5yr (+0.3, d1) -> housing market + business_investment (+2.0, d2) + consumer_spending (+0.75, d2). The transmission mechanism students need to see.
Ducklings Simulation
This proposal is active in the Ducklings causal simulation (Epoch 33). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.
Domain: Monetary Policy | Proposal ID: 85 | Series: Continuum
How to Engage
Discuss this flightplan in the Pond forum under Monetary Policy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.
Contact: [email protected]