CDK
🦆
Ducklings Continuum Proposal
Epoch 39 Continuum Housing Short-term (0–2 years)
In Simulation

Housing Construction Boom: 300K Starts

âš  This is a flightplan, not a commitment. Flightplans are hypothetical policy proposals modelled in the Ducklings causal simulation. They become projects only when voted into adoption through Consensus. Metrics shown reflect simulation model outputs, not real-world outcomes.

Fiscal & Economic Impact

Implementation Cost
Revenue-neutral
Direct government spending
Projected Economic Impact
+$147.5B CAD
10 variables affected across the causal graph
No implementation cost
∞
Economic return per dollar spent
Top Cascade Effects (click to expand)
Public Debt Charges (Interest)+$113.5B CAD
Goods and Services Tax (GST)+$11.4B CAD
Personal Income Tax+$8.5B CAD
Elderly Benefits (OAS/GIS)+$7.1B CAD
Canada Child Benefit+$4.3B CAD
Impact figures are simulation model outputs from the Ducklings causal engine (BFS cascade, 3-hop depth, strength-weighted edges). They represent projected effects, not real-world outcomes.
Short-term (0–2 years)
Time Horizon
Not assessed
Implementation Risk
Epoch 39
Continuum Entry

Overview

Zoning reform, modular construction, and immigrant trades workers push housing starts to 300K annually. Chain: housing_starts -> construction_employment (+0.25, d1) + calgary_assessment_base (+0.40, d1) + housing_affordability (+0.30, d3) + housing_completions (+0.70, d6). The 6-epoch delay on completions shows the construction pipeline lag.

Ducklings Simulation

This proposal is active in the Ducklings causal simulation (Epoch 39). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.

Domain: Housing  |  Proposal ID: 95  |  Series: Continuum

How to Engage

Discuss this flightplan in the Pond forum under Housing. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.

Contact: [email protected]