TMX Pipeline at Full Capacity: 95%
Overview
Trans Mountain expansion reaches full operational capacity at 95% utilization. Chain: tmx_capacity_utilization -> western_canadian_select_discount (-0.40, d1). Higher pipeline throughput narrows the WCS-WTI price spread that has cost Alberta billions in stranded value.
Ducklings Simulation
This proposal is active in the Ducklings causal simulation (Epoch 45). The simulation models downstream effects using a BFS cascade engine with strength-weighted, time-delayed edges capped at 3-hop depth and ±25% per-hop limits. Cascade outputs are bounded by variable saturation thresholds.
Domain: Energy | Proposal ID: 110 | Series: Continuum
How to Engage
Discuss this flightplan in the Pond forum under Energy. Vote on adoption through Consensus. Adopted flightplans become projects with real-world implementation tracking.
Contact: [email protected]