Gladstone connect projects
The Gladstone Connect design involved connecting the Kensington/Hillhurst community drainage improvements to the existing 7 Street Trunk in Sunnyside to help relieve the existing drainage systems.
The design included flow control points to manage and ensure that water being redirected from Hillhurst Kensington doesn’t inundate Sunnyside.