πŸ“
Development & Planning
Community-level forum topic. Shared canonical term created 2026-05-07 (Phase 3.5
0 topics 0 posts
in Development & Planning

SUMMARY β€” Gladstone Connect Projects

> **Auto-generated summary β€” pending editorial review.** > This article was drafted by the CanuckDUCK editorial summarizer on 2026-04-30. > If you spot something off, edit the page or flag it for the editors. The Gladstone Connect project in Calgary aimed to improve drainage systems and mitigate flood risks in the Kensington/Hillhurst community by connecting them to the existing 7 Street Trunk in Sunnyside. While the project has been completed, the forum has minimal discussion on its impacts, benefits, and potential challenges.
in Development & Planning

SUMMARY β€” McHugh Bluff Slope Remediation Project

> **Auto-generated summary β€” pending editorial review.** > This article was drafted by the CanuckDUCK editorial summarizer on 2026-04-30. > If you spot something off, edit the page or flag it for the editors. The McHugh Bluff slope remediation project, completed in August 2025, aimed to stabilize a section of the bluff behind 3 Avenue N.W. in Calgary following heavy rainfall in 2021. While the project is now concluded and the pathway reopened, the forum has limited discussion on the topic.
in Development & Planning

SUMMARY β€” Sunnyside LRT Station Crossing Arm Upgrades

> **Auto-generated summary β€” pending editorial review.** > This article was drafted by the CanuckDUCK editorial summarizer on 2026-04-21. > If you spot something off, edit the page or flag it for the editors. The Sunnyside LRT Station Crossing Arm Upgrades are a critical infrastructure project aimed at improving safety and efficiency for pedestrians and vehicles at the Sunnyside LRT station. As Calgary continues to grow and its public transit system expands, ensuring safe and efficient crossings at busy transit hubs is essential.
Alberta
Approved in Development & Planning

Mobility - Transportation improvements

Project update – September/October 2025

  • 2 Avenue/ 7 Avenue N. W. corridor improvements β€“ Starting late September/early October, on Saturdays and Sundays, milling will take place along the 2 Avenue N.W. corridor between 10 Street and 5A Street N.W. Concrete for wheeling lanes will be installed in the weeks following the milling.
Alberta
Approved in Development & Planning

Gladstone connect projects

Gladstone connect projects

About this project

The Gladstone Connect design involved connecting the Kensington/Hillhurst community drainage improvements to the existing 7 Street Trunk in Sunnyside to help relieve the existing drainage systems.

The design included flow control points to manage and ensure that water being redirected from Hillhurst Kensington doesn’t inundate Sunnyside. 

Alberta
Approved in Development & Planning

Northwest Inner-City Community Drainage Improvements

About the project

We’re investing in upgrades to water infrastructure in the inner-city northwest communities to enhance the safety of residents and protect vulnerable areas from the damages caused by stormwater flooding.

Much of the stormwater infrastructure in the area was built to the standard of the time but is now outdated and is being fixed to significantly increase the capacity in these neighbourhoods and reduce flooding caused by intense rainfall.

With support from the Government of Alberta, the construction of these upgrades started in 2021.

Alberta
Approved in Development & Planning

Sunnyside Flood Barrier Project

Sunnyside Flood Barrier Project

We're investing in Sunnyside, Hillhurst and along the Memorial Park Corridor to increase flood resiliency and create spaces that enhance the connection with the river, community and natural environment, while commemorating our heritage.